The Impact of Information Technology Adoption and Strategic Partnerships Through Supply Chain Integration on Project Performance
Downloads
This study addresses the persistent issue of construction project delays in Indonesia, proposing information technology (IT) adoption and strategic partnerships as key solutions to enhance project performance. Despite substantial infrastructure investment through the Proyek Strategis Nasional (PSN) program, construction delays remain a critical challenge, which cause cost overruns and suboptimal development outcomes. The research objective is to examine how IT adoption and strategic partnerships influence project performance, both directly and indirectly through supply chain integration, within state-owned construction enterprises (BUMN). The study employed a quantitative approach using questionnaires distributed through purposive sampling to 160 managers in five major construction BUMNs, followed by instrument testing using Smart PLS 4.1.1.4 software, including Outer Model Test, Inner Model Test, General Bias Test, and Hypothesis Test. The results demonstrate that: (a) Information Technology Adoption positively and significantly affects Supply Chain Integration ( -value = 4.592, -value = 0.000); (b) Strategic Partnership positively and significantly affects Supply Chain Integration ( -value = 6.501, -value = 0.000); (c) Information Technology Adoption positively and significantly affects Project Performance ( -value = 3.662, -value = 0.000); (d) Strategic Partnership has a negative and insignificant effect on Project Performance ( -value = 0.561, -value = 0.575); (e) Supply Chain Integration positively and significantly affects Project Performance ( -value = 5.379, -value = 0.000). The mediation analysis reveals that Supply Chain Integration serves as a critical mediating mechanism through which both IT adoption and strategic partnerships indirectly enhance project performance. These findings contribute to supply chain management theory by demonstrating that technological and relational capabilities must be integrated through supply chain processes to achieve optimal project outcomes.
AlRushood, M. A., Rahbar, F., Selim, S., & Dweiri, F. (2023). Accelerating use of drones and robotics in post-pandemic project supply chain. Drones, 7(5), 313. https://doi.org/10.3390/drones7050313
BUMN, K. (2023). National strategic project data. Ministry of State-Owned Enterprises. http://www.bumn.go.id
Carvalho, J. P., Villaschi, F. S., & Bragança, L. (2021). Assessing life cycle environmental and economic impacts of building construction solutions with BIM. Sustainability, 13(16), 8914. https://doi.org/10.3390/su13168914
Cipriani, E., Giannantoni, L., & Mannini, L. (2023). Integrated variable speed limits and user information strategy. Sustainability, 15(14), 10954. https://doi.org/10.3390/su151410954
Dinanty, M. (2022). Enhancement of CSR programs to improve value creation for the stakeholder: A case study of PT Adhi Karya (Persero) Tbk. European Journal of Business and Management Research, 7(4), 143–147. https://doi.org/10.24018/ejbmr.2022.7.4.1500
Eitan, A., Herman, L., Fischhendler, I., & Rosen, G. (2019). Community–private sector partnerships in renewable energy. Renewable and Sustainable Energy Reviews, 105, 95–104. https://doi.org/10.1016/j.rser.2018.12.058
Fahmi, F. (2017). Analysis of the main factors that affect the implementation time of the Jabodebek LRT (Light Rail Transit) infrastructure development project (Master’s thesis). Institut Teknologi Sepuluh Nopember, Surabaya.
Ferstad, H. K., Engebø, A., Slette, P. A., & Lædre, O. (2023). Strategic Partnering Between Client, Contractor, and Subcontractor. Proceedings of the 31st Annual Conference of the International Group for Lean Construction (IGLC31), 1674–1685. https://doi.org/10.24928/2023/0155
Hafizh, N., & Wandebori, H. (2024). Corporate strategy in merger plans for construction-based business state-owned enterprises: A case study of PT Pembangunan Perumahan Tbk and PT Wijaya Karya Tbk. International Journal of Current Science Research.
Hua, Y., Kang, F., Zhang, S., & Li, J. (2021). Impacts of task interdependence and equivocality on ICT adoption in the construction industry: A task–technology fit view. Architectural Engineering and Design Management, 19, 92–109. https://doi.org/10.1080/17452007.2021.2020084
Kock, N. (2019). Factor-based structural equation modeling with WarpPLS. Australasian Marketing Journal, 27(1), 57–63. https://doi.org/10.1016/j.ausmj.2019.02.002
Koolwijk, J. S. J., van Oel, C., & Bel, M. (2021). The interplay between financial rules, trust and power in strategic partnerships in the construction industry. Engineering, Construction and Architectural Management. https://doi.org/10.1108/ECAM-09-2020-0713
Masa’deh, R., Muheisen, I., Obeidat, B., & Bany Mohammad, A. (2022). The impact of supply chain integration on operational performance: An empirical study. Sustainability, 14(24), 16634. https://doi.org/10.3390/su142416634
Sang, L., Yu, M., Lin, H., Zhang, Z., & Jin, R. (2020). Big data, technology capability and construction project quality: A cross-level investigation. Engineering, Construction and Architectural Management, 28(3), 706–727. https://doi.org/10.1108/ECAM-02-2020-0135
Saputro, T. E., Figueira, G., & Almada-Lobo, B. (2020). Integrating supplier selection with inventory management under supply disruptions. International Journal of Production Research. https://doi.org/10.1080/00207543.2020.1866223
Sarstedt, M., & Cheah, J.-H. (2019). Partial least squares structural equation modeling using SmartPLS: A software review. Journal of Marketing Analytics, 7, 196–202. https://doi.org/10.1057/s41270-019-00058-3
Sarstedt, M., & Ringle, C. M. (2020). Structural equation models: From paths to networks. Psychometrika, 85, 1–7. https://doi.org/10.1007/s11336-020-09719-0
Paulsen, S. B., Engebø, A., & Lædre, O. (2022). Strategic Partnering Between Contractors and Designers. Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC), 330–341. https://doi.org/10.24928/2022/0134
Yurianto, K. Y. (2020). Identify the factors that affect the delay of the Jakarta–Bandung high speed train. Jurnal Teknik Sipil, 3(1). https://ejournal.trisakti.ac.id/index.php/sipil/article/view/8022
Zhang, X., Li, R. Y. M., Sun, Z., Li, X., Samad, S., Comite, U., & Matac, L. M. (2022). Supply chain integration and its impact on operating performance: Evidence from Chinese online companies. Sustainability, 14(21), 14330. https://doi.org/10.3390/su142114330
Zhao, J., Seppänen, O., Peltokorpi, A., Badihi, B., & Olivieri, H. (2019). Real-time resource tracking for analyzing value-adding time in construction. Automation in Construction, 104, 52–67. https://doi.org/10.1016/j.autcon.2019.04.003
Zohoori, B., Verbraeck, A., Bagherpour, M., & Khakdaman, M. (2019). Monitoring production time and cost performance by combining earned value analysis and adaptive fuzzy control. Computers & Industrial Engineering, 127, 805–821. https://doi.org/10.1016/j.cie.2018.11.019
Copyright (c) 2025 Dimas Maulana, Ritman Miko Hartanto, Ibrahim Bahasoan, Rano Kartono Rahim

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-ShareAlike 4.0 International. that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work.







